Is this your property? Sell it faster with premium placement and targeted ads.
This Project Represents a Rare opportunity to acquire the Final Phase of the Heber Meadows subdivision: This property consists of two parcels APNs #054-601-021-000 (7.56 AC)& #054-605-068-000 (33,976 sqft) Total of 8.34 Acres. Heber Meadows subdivision Last phase has 43 tentative approved lots across two APNs, backed by a recorded map that cannot expire once partially built and prepaid water and sewer capacity fees that provide Immediate Cost Savings. With infrastructure already installed (water, sewer, electrical, roads, curb & gutter, streetlights, and Pitzer Road connection), the site is nearly permit-ready with 11 fully improved lots that are perfect for model homes and 32 in blue-top condition. Zoned R1, the property also offers the possibility of multifamily or apartment development, supported by the neighboring Chelsea Investment Group's 320-unit project underway. Existing homes...
This Project Represents a Rare opportunity to acquire the Final Phase of the Heber Meadows subdivision: This property consists of two parcels APNs #054-601-021-000 (7.56 AC)& #054-605-068-000 (33,976 sqft) Total of 8.34 Acres. Heber Meadows subdivision Last phase has 43 tentative approved lots across two APNs, backed by a recorded map that cannot expire once partially built and prepaid water and sewer capacity fees that provide Immediate Cost Savings. With infrastructure already installed (water, sewer, electrical, roads, curb & gutter, streetlights, and Pitzer Road connection), the site is nearly permit-ready with 11 fully improved lots that are perfect for model homes and 32 in blue-top condition. Zoned R1, the property also offers the possibility of multifamily or apartment development, supported by the neighboring Chelsea Investment Group's 320-unit project underway. Existing homes in this subdivision are selling in the $400,000$475,000 range, demonstrating strong retail values. Location advantages include recent Pitzer Road improvements from Meridian Street to State Route 86, as well as proximity to Interstate 8, El Centro (pop. ~44,000), Imperial (fastest-growing city, pop. ~19,000), and Calexico (pop. ~38,500, high rental demand, no new construction in 30+ years). Surrounded by strong demand drivers such as Dogwood Elementary, Imperial Valley Mall, El Centro Regional Medical Center, Imperial Valley College, and SDSU Calexico campus, and with due diligence materials already available (grading plan, tentative map, and water & sewer fee exemption), Heber Meadows Phase 4 stands out as one of Imperial Valley's most strategic, shovel-ready development opportunities.
Copyright © 2025 Imperial County Association of Realtors®. All rights reserved. All information provided by the listing agent/broker is deemed reliable but is not guaranteed and should be independently verified.
Search for detailed parcel information including; Elevation & Vegetation Maps, Ownership Information, Detailed Parcel Information, Crop History Map, Soil Survey Productivity Data, and more.
Research Parcel InformationIs this your property? Sell it faster with premium placement and targeted ads.