Still recovering from fireworks, family BBQs, and the realization that your apartment walls are thinner than your patience? Good news freedom didn't end on July 4th. It just got cheaper.
We're rolling out a Post-Independence Land Deal that lets you ditch the noise, overpriced rent, and HOA drama and own 1.25 acres in stunning Mohave County, AZ for just $100/month. No credit check. No nonsense. Just wide-open desert bliss and a chance to finally claim your piece of America.
Why This Land Rocks:
Post-Independence Special: $100/month Celebrate freedom after the fireworks
1.25 Acres of scenic Arizona desert to call your own
Owner Financing with no credit check & no banks
Zero HOA you make the rules out here
County-maintained dirt road access smooth ride in, smooth life ahead
Elevation 3,2183,278 ft perfect for panoramic views, fresh air, and incredible sunsets
Zoned for rural living build, cam...
Zoned for rural living build, camp, RV, or just hold and dream
Out here, the silence is golden, the views are endless, and your phone still works (unless you're screening calls in which case, we respect that).
This Post-Independence Sale won't last long. Because celebrating independence shouldn't stop on July 4th.
PAYMENT INFO:
Cash Price: $3,500
Owner Financing Terms: $100 Monthly For 40 Months
Down Payment: $100
Doc Fee: $250
PROPERTY INFO:
County: Mohave
State: Arizona
Size: 1.25
APN: 338-11-248
Location: Kingman, Arizona 86444
COORDINATE
Center: 3557'47.6"N,1141'24.15"W
NW: 3557'48.41"N,1141'26.17"W
NE: 3557'48.41"N,1141'22.16"W
SE: 3557'46.78"N,1141'22.16"W
SW: 3557'46.78"N,1141'26.17"W
COUNTY INFO:
Zoning: Recreational Residential
Camping: Tent camping is not allowed but RV camping is allowed for up to two weeks at a time, but no more than 30 calendar days in a year.
RVs: RVs are allowed. One could camp with an RV for up to two weeks at a time, but no more than 30 calendar days in a year. If one wanted to live in their RV or stay longer than the previously identified time they will need to obtain a Temporary Residence Permit.
Mobile Home: Mobile homes are allowed. It will need to be manufactured after June 15, 1976, be installed by a licensed installer, have a verifiable HUD date plate, and have state-approved skirting within 90 days of installation.
Water: Need to build a well or haul water
Sewer/Septic: Septic
Electric: Solar, wind, or generator
Gas: No natural gas. LP, diesel, or tank.
Search for detailed parcel information including; Elevation & Vegetation Maps, Ownership Information, Detailed Parcel Information, Crop History Map, Soil Survey Productivity Data, and more.
Research Parcel InformationHudson, WI