Construction on the site will start in summer of 2020 for all site work.
Current plans call for a public road,a City of Mustang Ridge city street, (new), constructed at north side of property and connecting via a public access, private drive on the southern entrance to the park.
Horizontal infrastructure will include 3 phase power,city streets, waste water treatment plant, (common to the park)and high speed internet.
Plans are for a 22 acre Multi-Use Retail/Commercial Park, platted as 8 lots. On the northern side will be 577 feet of US 183 frontage, 72,000 Sq Ft. of Min-warehouse and 4 lots sold either as is, or to be built.
Lot Descriptions are as follows:
Lot 1 2.548 acre Detention Basin
Lot 2 1.242 acre Restricted to Tilt Wall Brick/Stone Facade Retail
Lot 3 1.195 acre SOLD
Lot 4 1.006 acre
Lot 5 1.016 acre
Lot 6 0.757 acre
Lot 7 0.747 acre
Lot 8 7.305...
Lot 8 7.305 acre retained by developer for MiniWarehouse
Lot 9 reserved
Lot 10 reserved
Lot 11 reserved
Search for detailed parcel information including; Elevation & Vegetation Maps, Ownership Information, Detailed Parcel Information, Crop History Map, Soil Survey Productivity Data, and more.
Research Parcel InformationFrom Intersection of US 183 and toll 45. Head north past Von Quintus road. Currently access is a road on south side of property.