Built by Integrity Construction! This quality home features first floor laundry, split bedroom design too. Master suite with double sinks, walk in closet and walk-in shower. The lower level is stubbed for future bath, there is an egress window too. Concrete patio out back. An ideal closing date would be October 22, 2018.
Search for detailed parcel information including; Elevation & Vegetation Maps, Ownership Information, Detailed Parcel Information, Crop History Map, Soil Survey Productivity Data, and more.
Research Parcel InformationE on Bell to S on Marathon.